Countries

Latvia — EV charging and AC up to 22 kW

The 2026 building rules make smart charging and load management highly relevant.

Easier
HUBCORE estimate 4.5/5
Updated 11.08.2026

The 1–5 score is HUBCORE's operational estimate of how smoothly an AC solution of up to 22 kW can be prepared and delivered in practice. It is not an official country rating or an assessment of the quality of national regulation.

In 60 seconds

In Latvia, charging requirements for new buildings and major renovations are set out clearly in building standard LBN 200-21.

A required charging point must enable smart charging and, where necessary, bidirectional charging.

Cabling must be dimensioned for simultaneous use, but load or charging management may be provided where needed.

This means a controllable solution is not an add-on but a normal part of the project.

AC up to 22 kW: what must be checked?

  • Existing grid connection capacity

    Check the building's input capacity and whether cabling is dimensioned for simultaneous use or relies on management.

  • Capacity upgrade

    If capacity must be increased, a grid operator procedure and cost are added; load management can often avoid this.

  • Apartment building decision

    In a jointly owned building, an owners' decision and a clear agreement on costs and use are needed.

  • Public or private use

    For a publicly accessible point, AFIR requirements on ad hoc charging, payment and price information apply.

  • Installer requirements

    Installation and design must meet local construction and electrical requirements; involve a competent local partner.

Detached house

A detached-house solution is technically simple: one charging point, the existing supply and home load management. AC up to 22 kW is possible, but actual power depends on the vehicle and the house's available capacity.

Apartment building

Under LBN 200-21 (7 July 2026 version), new residential buildings with more than 3 parking spaces need at least 1 charging point, with 50% of spaces pre-cabled and ducts for the rest. For a renovated residential building, the charging point itself is not always mandatory.

Commercial property

New non-residential buildings with more than 5 parking spaces, and major renovations, require at least 1 charging point per 5 spaces; for office buildings 1 per 2 spaces. At least 50% of spaces must be pre-cabled, with ducts for the rest.

Public charging

The AFIR framework applies to public charging. In renovation the requirement may be disapplied if the cost of charging points and ducts exceeds 10% of the total cost of the major renovation — this exemption must be documented in the project.

Advantages

  • The 2026 rules make smart charging and load management a natural part of the project.
  • Demand in new buildings is strong and the scope of pre-cabling is known in advance.
  • The requirement to enable smart charging and, where needed, bidirectional charging fits HUBCORE's controllability principle.

Drawbacks and risks

  • Design documentation and approvals can be substantial per site.
  • Joint-ownership decisions extend the timeline of apartment-building projects.
  • The 10% cost threshold in renovations can disapply the requirement and reduce project scope.

What HUBCORE solves here

  • Dynamic load management that allows the cabling to be used without exceeding the input capacity.
  • Measurement and an overview of energy flows at building level.
  • Coordinated control of multiple charging points.
  • Reporting and integration readiness for the manager and partner.

We keep track of markets and technology and guide the customer to a suitable solution. A solution must be measurable, controllable and integrable.

Check before quoting

  • Building type and number of parking spaces.
  • Whether it is a new build or a major renovation.
  • Input capacity and measured load.
  • Extent of pre-cabling and ducts in the design.
  • Whether the renovation 10% exemption applies.

Official sources

Updated 11.08.2026 A general technical and regulatory overview; the solution for a specific site must be confirmed with the local grid operator, a competent electrical installer and, where relevant, the local authority.