Elektrivõrgu taristu öösel
Charging

Smart everyday charging where the car already parks

HUBCORE solutions are in a pilot and partner-development stage. We do not claim a finished nationwide network or unconfirmed partnerships. Where a feature is still in development, it is labelled as such in the interface.

AI illustration
Kalkulaator · ET

Kui kaua auto laeb ja mitu kohta saab luua?

Võrdle pistikhübriidi ja elektriauto laadimisaega ning proovi, kuidas mitu laadimiskohta jagavad hoone vaba elektrivõimsust.

Ava laadimiskalkulaator

Muudetavad näited ja selgitused. Arvutus on esialgne hinnang; lõpliku lahenduse kinnitab elektriprojekt.

Request a quote

We confirm equipment compatibility, work scope and price before you order.

Learn more

EV information corner

Selected European variants, not an official ranking. Check the exact model year and equipment.

Mini charging

1-phase 230 V

A managed socket or low-power charging point. Suitable where cars park for longer — apartment lots, workplaces, regular destinations.

  • Single or dual socket/point per site
  • Metering and user identification
  • Load management and protective safety
  • Low infrastructure cost, simple installation
Medium charging

Smart AC up to 22 kW

Mainly 3-phase AC charging up to 22 kW with dynamic load management and phase awareness. Scalable to multi-charger sites.

  • Multiple chargers sharing a capacity limit
  • Dynamic phase-aware distribution
  • User identification and metering
  • Scalable installation and future expansion
HUBCORE Controller

Central energy brain

A control direction that ties outputs, charging, solar and battery into one load and priority logic.

  • We measure how load is distributed across phases and when the daily peaks occur.
  • Energy-flow monitoring across the building
  • We confirm equipment compatibility, work scope and price before you order.
  • Site assessment, metering and phased deployment.
See the solution

Actual charging power depends on the vehicle, currently available grid capacity at the site, load management and any battery buffer.

We are researching how to redistribute and meter spare capacity between phases more precisely.

Comparison: Mini vs Medium

Mini (230 V)Medium (up to 22 kW)
Suitable parking durationLong (overnight, workday, several hours)Medium (1–4+ hours)
Typical use caseApartment lot, workplace parking, destinationWorkplace, shared lot, commercial
Infrastructure complexityLowMedium
Expansion pathAdd more points graduallyScales with the site and connection
User experiencePlug in and leaveSmart sharing between multiple users

We do not fix specific charging times — they depend on the vehicle, battery state and on-site capacity.

Why not always a fast charger?

DC fast charging is expensive in equipment, installation and grid capacity. Apartment, workplace or street-lighting connections rarely support it sensibly.

Most cars are parked far longer than they need for charging. Normal AC charging uses that dwell time efficiently.

Slower AC charging is generally gentler on the vehicle in daily use than constant DC fast charging.

Fast charging belongs to long trips and highway corridors. HUBCORE focuses on the local everyday user.

Quality and standardisation

We confirm equipment compatibility, work scope and price before you order.

  • Unified hardware and software logic
  • Standard protection and safety
  • Same metering and billing model
  • Unified documentation and labelling

Would a charging point suit your site?

We give an honest assessment — Mini, Medium or a combination, along with a capacity analysis.

Public charging — is that charger even public?

Status, price, payment methods, QR code and 24/7 support on one screen — see the charge point view sample.

Public charging

Where to look for what

Frequently asked questions

How do Mini and Medium charging differ?
Mini charging is a single-phase 230 V controllable outlet or a low-power charging point, suited to long parking and everyday driving. Medium charging is three-phase smart AC charging up to 22 kW with dynamic load management.
What does “smart charging up to 22 kW” mean?
It is the upper limit of three-phase AC charging. The actual power depends on the vehicle's on-board charger, the grid capacity currently free at the building or site, load management and any battery buffer. 22 kW is not guaranteed in every situation.

Price

Price depends on region and site scope.

  • Main fuse and grid connection capacity
  • Main distribution board, cables, earthing and protection
  • Parking area and cable routes

What data is needed before deciding?

  • Address or location description
  • Main fuse (if known)
  • Vehicle model
Request an assessment
HUBCORE Validation Lab — we welcome equipment, vehicles, technology, pilot sites, sponsors and supporters.
Propose collaboration