Smart everyday charging where the car already parks
HUBCORE solutions are in a pilot and partner-development stage. We do not claim a finished nationwide network or unconfirmed partnerships. Where a feature is still in development, it is labelled as such in the interface.
Kui kaua auto laeb ja mitu kohta saab luua?
Võrdle pistikhübriidi ja elektriauto laadimisaega ning proovi, kuidas mitu laadimiskohta jagavad hoone vaba elektrivõimsust.
Ava laadimiskalkulaatorMuudetavad näited ja selgitused. Arvutus on esialgne hinnang; lõpliku lahenduse kinnitab elektriprojekt.
We confirm equipment compatibility, work scope and price before you order.
Learn more
EV information corner
Selected European variants, not an official ranking. Check the exact model year and equipment.
1-phase 230 V
A managed socket or low-power charging point. Suitable where cars park for longer — apartment lots, workplaces, regular destinations.
- Single or dual socket/point per site
- Metering and user identification
- Load management and protective safety
- Low infrastructure cost, simple installation
Smart AC up to 22 kW
Mainly 3-phase AC charging up to 22 kW with dynamic load management and phase awareness. Scalable to multi-charger sites.
- Multiple chargers sharing a capacity limit
- Dynamic phase-aware distribution
- User identification and metering
- Scalable installation and future expansion
Central energy brain
A control direction that ties outputs, charging, solar and battery into one load and priority logic.
- We measure how load is distributed across phases and when the daily peaks occur.
- Energy-flow monitoring across the building
- We confirm equipment compatibility, work scope and price before you order.
- Site assessment, metering and phased deployment.
Actual charging power depends on the vehicle, currently available grid capacity at the site, load management and any battery buffer.
We are researching how to redistribute and meter spare capacity between phases more precisely.
Comparison: Mini vs Medium
| Mini (230 V) | Medium (up to 22 kW) | |
|---|---|---|
| Suitable parking duration | Long (overnight, workday, several hours) | Medium (1–4+ hours) |
| Typical use case | Apartment lot, workplace parking, destination | Workplace, shared lot, commercial |
| Infrastructure complexity | Low | Medium |
| Expansion path | Add more points gradually | Scales with the site and connection |
| User experience | Plug in and leave | Smart sharing between multiple users |
We do not fix specific charging times — they depend on the vehicle, battery state and on-site capacity.
Why not always a fast charger?
DC fast charging is expensive in equipment, installation and grid capacity. Apartment, workplace or street-lighting connections rarely support it sensibly.
Most cars are parked far longer than they need for charging. Normal AC charging uses that dwell time efficiently.
Slower AC charging is generally gentler on the vehicle in daily use than constant DC fast charging.
Fast charging belongs to long trips and highway corridors. HUBCORE focuses on the local everyday user.
Quality and standardisation
We confirm equipment compatibility, work scope and price before you order.
- Unified hardware and software logic
- Standard protection and safety
- Same metering and billing model
- Unified documentation and labelling
Would a charging point suit your site?
We give an honest assessment — Mini, Medium or a combination, along with a capacity analysis.
Public charging — is that charger even public?
Status, price, payment methods, QR code and 24/7 support on one screen — see the charge point view sample.
Where to look for what
Smart power points
Metered, controllable outputs: USB-C and 230 V.
Public charging
Public access and finding charging locations.
Energy management
Building energy flows, solar and battery in one logic.
Load management
Main fuse limits, priorities and phase balance.
For businesses
The buyer's view — it gathers the directions and links to the deeper pages.
Frequently asked questions
- How do Mini and Medium charging differ?
- Mini charging is a single-phase 230 V controllable outlet or a low-power charging point, suited to long parking and everyday driving. Medium charging is three-phase smart AC charging up to 22 kW with dynamic load management.
- What does “smart charging up to 22 kW” mean?
- It is the upper limit of three-phase AC charging. The actual power depends on the vehicle's on-board charger, the grid capacity currently free at the building or site, load management and any battery buffer. 22 kW is not guaranteed in every situation.
Price
Price depends on region and site scope.
- Main fuse and grid connection capacity
- Main distribution board, cables, earthing and protection
- Parking area and cable routes
What data is needed before deciding?
- Address or location description
- Main fuse (if known)
- Vehicle model