Workplace EV charging: how to plan a company car park
Start with parking time, required energy and spare building capacity. A charger power rating alone does not tell you whether a solution suits your business.
Short answer
AC charging with load management often suits workplace parking. Charger count and power depend on energy needs, parking duration and building load. A full battery or fixed savings cannot be promised for every car. Plan management, user access and cost allocation together with the infrastructure.
1. Map users and daily energy needs
Separate employee vehicles, the company fleet and visitors. Establish parking duration, required energy before departure and which vehicles need priority. Short visits and a full working day may need different charging arrangements.
Plan cable routes and switchboard capacity for growth, but add chargers based on actual demand. For leased premises, agree investment, usage rights and end-of-lease arrangements between owner and tenant first.
2. Calculate energy, not only charger ratings
For illustration, ten cars each needing 15 kWh require 150 kWh at the batteries. A steady 30 kW over six hours gives a theoretical 180 kWh before losses. This does not guarantee full batteries: connection time, vehicle limits, actual power and charging losses affect the result.
The onboard charger, phases and cable may limit AC charging below the station rating. A 22 kW unit does not automatically charge an 11 kW vehicle faster. Choose for the users and site, not just the catalogue.
3. Load management considers the building
A fixed limit caps a charger. Static sharing caps a group. Dynamic control adapts charging to measured building demand; required meters, phase limits and outage behaviour are established in the design.
Choose cloud control or local control with cloud management for the site. Verify which functions survive an internet outage with the selected equipment. Coordinated solar, battery or building-automation control depends on models and interfaces; it is not automatic for every device.
4. Define usage rules and costs
Agree who may charge, how users identify, when cars should move and whether the fleet has priority. Apps, RFID, notifications, idle fees and visitor access depend on the supported service scope. A session ending does not prove the parking space is vacant.
Separate investment, energy, network charges, management, connectivity and maintenance. Check tax treatment of free or discounted employee charging with your accountant. User-level accounting helps allocate costs, but economics depend on real usage and contract charges.
5. Existing chargers and public use
Whether existing chargers can remain depends on manufacturer, model, firmware, protocol and access checks. Not every device can join a new platform and existing investment cannot always be retained unchanged.
Opening to the public needs a separate usage and payment model, access arrangements and a site assessment. Public discovery, payments and any roaming are confirmed contractually and technically. Evening use may be an opportunity, but income is not guaranteed.
6. What information is needed for an assessment?
Send the area, parking-space count, employee and fleet vehicle numbers, parking hours and existing chargers. Main fuse size, demand data and cable-route photographs help refine the assessment; missing details do not prevent an initial enquiry.
HUBCORE assesses charger management and power control, including required equipment and installation scope. Next steps, suitable devices, delivery partners and billing are confirmed in the site proposal.
Frequently asked questions
Does every workplace need rapid charging?
No. AC charging may suit long parking times. A fleet with short turnarounds needs a separate calculation.
Does load management guarantee a full battery?
No. It allocates limited capacity. Delivered energy depends on power, time, losses and vehicle demand.
Are existing chargers compatible?
Compatibility is confirmed through model, firmware, interface and access checks before offering the service.
Need an answer for your site?
Describe the area, car park size, vehicle count and parking hours. Add existing charger models if known. Request an assessment for your site.
Request a technical pre-assessmentSources and assessment basis
Edited on 3 November 2026. Recheck conditions and requirements before commissioning site work.