HUBCORE Intelligence

HUBCORE Opportunity Map

Where is it worth building charging infrastructure? The map combines local demand, existing competition, available grid headroom and parking dwell into one Opportunity Score. V1 uses sample data — external registries are not connected yet.

All area data is sample data and every financial figure is a model calculation based on the user's assumptions. HUBCORE does not present these as real data and guarantees no payback. The recommendation defaults to 22 kW capable, dynamically managed charge points; the actually available power depends on the vehicle, the site's free capacity and load management.

Filters

Choose country, city, charger type, power class, period and audience. Filters drive both the map and the list.

Sample data

Opportunity map

Schematic preview. Green = high potential, yellow = watch, red = low potential. Exact addresses are never published.

Sample data
  • High potential
  • Watch / medium
  • Low potential
Data source in preparation — coverage and accuracy improve once external registries are connected. Last update: 1 Aug 2026, 06:00 UTC

Tallinn · Lasnamäe

Area detail. All figures are model calculations on sample data, not measured market data.

Sample data
High potentialSample dataHousing associationInvestorMunicipality
Opportunity Score86 / 100
Estimated EVs96
Existing chargers4 × 22 kW AC
Residents / parking spaces118 000 / 420
Charge point requests11
Estimated annual demand84 000 kWh
Confidencemedium
Recommended charge points48
Device maximum capability22 kW · Medium 22 kW
Projected available power41 kW
Per point under load management0.9 kW
Possible annual revenue3360 €
Payback period150 a

Opportunity Score components

  • Demand100
  • Competition100
  • Capacity68
  • Access78
  • Visibility62
  • Parking dwell100
  • Growth trend60

Risks

  • Site headroom does not cover all points at full power — dynamic load management is mandatory.

Comparison mode

Pick at least three areas to compare. Selection happens on the cards below the map.

Not enough areas selected yet. Turn comparison on and tick at least three areas.

Data sources — in preparation

The map is built so these sources can be connected later without changing the view. Until then every figure carries the sample-data label.

  • Public charger registryIn preparation
  • EV registrationsIn preparation
  • Population and buildingsIn preparation
  • Traffic dataIn preparation
  • Weather (Open-Meteo)In preparation
  • Market price (Elering)In preparation
  • HUBCORE charge point requestsIn preparation
  • Plugfree / HUBCORE session dataIn preparation

Model assumptions: 2500 kWh per EV per year, 2 EVs per point, 35% of demand captured on site. These are assumptions, not a HUBCORE price list.