HUBCORE
Info flyer for apartment associations
Start with a single charging point and expand as residents actually need it — the same control system grows with you.
What does HUBCORE assess and measure on site?
- Main fuse and grid connection capacity — We check the existing connection size and how much capacity is left for charging after the building's own consumption.
- Actual phase loads and load profile — We measure how load is distributed across phases and when the daily peaks occur.
- Main distribution board, cables, earthing and protection — We assess board condition, free space, cable cross-sections and whether protection and earthing are suitable.
- Parking area and cable routes — We look at parking layout, distance from the board and possible routes along walls, trays or trenches.
- Connectivity and remote monitoring readiness — We check whether usable internet exists on site or mobile connectivity is needed so devices can be monitored.
- Load-logger measurement when needed — If data is scarce, we install a temporary logger to see real consumption over a longer period.
- Electrical verification measurements and safety assessment — We carry out the necessary verification measurements and assess whether the installation can be safely used.
Important: whether the main fuse needs upgrading only becomes clear after measurement and technical analysis. Often the existing connection is enough when charging is dynamically managed.
One complete solution for the housing association
- EV AC charging up to 22 kW — Smart charging up to 22 kW. Actual power depends on the vehicle, the building's available grid capacity, load management and any battery buffer.
- Dynamic load management — Charging power adapts to the building's real consumption so the main fuse is not overloaded.
- Individual metering and fair billing — Each user's consumption is measured separately, so nobody pays for someone else's charging.
- Private, shared, guest and optionally public points — The association decides which points are private, which are shared and whether guests or public use are allowed.
- Electricity, water and heat meter data — Compatible meters can be connected into one view so building data is together and comparable.
- Energy monitoring of heating, ventilation and building systems — We monitor major consumers' energy use to show where the building's energy actually goes.
- Solar and battery storage readiness — The control layer is prepared for adding solar panels and battery storage at a later stage.
- Remote monitoring, fault alerts, support and maintenance — Device status is visible remotely, faults raise an alert, and maintenance follows an agreed process.
- Future V2H/V2B readiness — The architecture anticipates vehicle-to-home/building energy flow in the future. This is not a guaranteed feature today and depends on vehicles, equipment and regulation.
How metering and cost sharing work
- Each user's charging session is identified by an account or an RFID card.
- Billing is based on the charger's metering data or a separate MID meter reading.
- A monthly consolidated invoice, prepayment or immediate guest payment are all possible.
- Residents and guests can have different tariffs, decided by the association.
- Infrastructure, maintenance and energy components are clearly separated on the invoice.
Start small, plan for the whole
- Initial data — Address, number of parking spaces, interested residents and the known main fuse size.
- On-site inspection and measurements — Review of the board, routes and load; a load logger if needed.
- Technical options and a price range — We present options with their benefits and limits so the association can compare.
- Association decision and electrical design — A general-meeting decision and a compliant electrical design before works begin.
- Installation and verification measurements — Installation with partners and safety verification measurements before commissioning.
- User setup and billing — User accounts, RFID, permissions and billing logic are agreed and configured.
- Remote monitoring, maintenance and expansion — Day-to-day monitoring, maintenance and adding new charging points as needed.
What we need for a preliminary assessment
- Association name and address
- Number of parking spaces
- Approximate number of residents interested in charging
- Main fuse size, if known
- Photos of the main distribution board and the parking area
- Existing electrical diagrams or 12 months of consumption data, if available